Rusta's central warehouse in Norrköping has expanded. The new building consists of 69,000 square meters. The expansion was started at the end of 2019 and was in operation during the fall of 2021. Prefabsystem Syd was the overall contractor for the expansion. The entire building is powered by geothermal energy and green electricity.
Peikko has supplied several models of HPM® Anchor Bolts with associated Anchor Bolt Installation Template to this project. The installation templates are designed to give the bolts an accurately position and be fixed into the molding with the PPL Anchor Bolt Installation Template.