As part of the new extension, the sanitary facilities for production workers in the production halls were also expanded and a new server room was built.
The building was designed so, that it could be extended by one additional floor if necessary.
DELTABEAM® Composite Beams were used in the slab structures to reduce the height of the floors. Bolted connections were used to connect the columns to columns, and columns to foundation. Also hidden corbels were used to connect the prefabricated beams to the columns so that this joint is not visible.