The new wing, designed by EASST Architects, expanded the company's Polish office, with a focus on openness, spatial flexibility, and sustainable development. The project was awarded BREEAM certification, confirming its high environmental and quality standards.
The use of DELTABEAM® Composite Beams, supported by Peikko PCs® Hidden Corbels, enabled the creation of flat, prefabricated floor slabs, which significantly improved the interior functionality. Thanks to the slim-floor structure, all installations could be run through the floor without lowering the ceilings. In addition, Peikko column connections accelerated the structural assembly process while ensuring high load-bearing capacity and connection safety.
This project is a great example of how modern architecture can be seamlessly combined with Peikko’s advanced construction technology.