This project applied a dry joint system to the stair core of the community facility within the apartment complex.

The construction-stage analysis was divided into three phases: after core element installation and before grout curing, after grout curing, and finally the stage where the core interacts with the main structural system. The construction was completed quickly and safely.

Hankkeen tiedot

Hankekehittäjä:
Samsung C&T Corporation
Rakennusliike:
Samsung C&T Corporation
Rakennesuunnittelija:
RISE STRUCTURAL ENGINEERING
Arkkitehti:
TAEHWA ENGINEERING CO., LTD (SHOP DESIGN)
Betonielementtivalmistaja:
KC INDUSTRY
Toimitusvuosi:
2023
Valmistumisvuosi:
2023